Wolverton Barn

Description

Imphouse Ltd have been awarded a Contract to strip an existing big 6 Asbestos cement sheet steel framed building, clean down prepare and paint the existing steel frame, break out the existing failed concrete floor, re clad roof and sides, and construct a new power floated reinforced concrete floor slab. In time for harvest 2012.